2027 Product Information Guide - English

FINISHING GUIDE / PERENNIALS

VERNALISATION REQUIRED FINISHING PROGRAMS FOR ANNUAL AND OVERWINTER PRODUCTION

KEY TIPS

Annual , 4"/4.5"/Quart/10 cm , 1 (ppp), 9-10 (weeks), Summer, ADT 72°F (22°C) PGR daminozide 5,000 ppm Spray Forcing , 4"/4.5"/Quart/10 cm , 1 (ppp), 9-10 (weeks), Late Spring, ADT 72°F (22°C) PGR daminozide 2,500-5,000 ppm Spray Forcing , 4"/4.5"/Quart/10 cm , 1 (ppp), 10-11 (weeks), Autumn, ADT 72°F (22°C) PGR daminozide 2,500-5,000 ppm Spray Annual , 5"/6"/1 Gallon/15 cm , 1-3 (ppp), 10-11 (weeks), Summer, ADT 72°F (22°C) PGR daminozide 5,000 ppm Spray Forcing , 5"/6"/1 Gallon/15 cm , 1-3 (ppp), 10-11 (weeks), Autumn, ADT 72°F (22°C) PGR daminozide 2,500-5,000 ppm Spray Forcing , 5"/6"/1 Gallon/15 cm , 1-3 (ppp), 10-11 (weeks), Late Spring, ADT 72°F (22°C) PGR daminozide 2,500-5,000 ppm Spray

No

Apply PGRs when buds are visible.

Annual , 5"/6"/1 Gallon/15 cm , 1-3 (ppp), 10-12 (weeks), Summer PGR paclobutrazol 20 ppm Spray Annual , 5"/6"/1 Gallon/15 cm , 1-3 (ppp), 11-13 (weeks), Spring PGR paclobutrazol 20 ppm Spray

No

See Cut Flower section for cut flower production for both field and greenhouse. Monitor for powdery mildew.

Overwinter , 5"/6"/1 Gallon/15 cm , 1-2 (ppp), 20-24 (weeks), Early Spring, ADT 55°F (13°C) PGR paclobutrazol 20 ppm Spray Annual , 5"/6"/1 Gallon/15 cm , 1-2 (ppp), 12-16 (weeks), Spring, ADT 60°F (16°C) PGR paclobutrazol 20 ppm Spray Overwinter , 8"/2 Gallon/20 cm , 3 (ppp), 20-24 (weeks), Early Spring, ADT 55°F (13°C) PGR paclobutrazol 20 ppm Spray Annual , 8"/2 Gallon/20 cm , 3 (ppp), 12-16 (weeks), Spring, ADT 60°F (16°C) PGR paclobutrazol 20 ppm Spray

No

Keep light levels as high as possible. No pinching needed. Do not allow plants to wilt. Ship this crop when one-third of the florets are open to reduce the risk of flower shattering during shipping.

Annual , 5"/6"/1 Gallon/15 cm , 1-3 (ppp), 10-12 (weeks), Summer PGR paclobutrazol 20 ppm Spray Annual , 5"/6"/1 Gallon/15 cm , 1-3 (ppp), 12-14 (weeks), Spring PGR paclobutrazol 20 ppm Spray Annual , 8"/2 Gallon/20 cm , 3 (ppp), 10-12 (weeks), Summer PGR paclobutrazol 20 ppm Spray Annual , 8"/2 Gallon/20 cm , 3 (ppp), 12-14 (weeks), Spring PGR paclobutrazol 20 ppm Spray Annual , 5"/6"/1 Gallon/15 cm , 1 (ppp), 11-13 (weeks), Summer PGR paclobutrazol 20 ppm Spray Annual , 5"/6"/1 Gallon/15 cm , 1 (ppp), 12-16 (weeks), Spring PGR paclobutrazol 20 ppm Spray

No

Avoid planting plugs too deep. Maintain good fertilisation, especially at flower initiation. Monitor for aphids, botrytis, powdery mildew.

No

PGRs: 2 paclobutrazol sprays, the first approximately 3 weeks after transplant and the second approximately 2 weeks later. Possible third application may be necessary, subject to conditions. Delphinium are especially sensitive to powdery mildew; spray preventively if necessary. Ship and sell latest with flower spike one third open to decrease risk of petal shattering. See Cut Flower section for more details on cut flower production. Container production: PGR paclobutrazol 1 or 2 applications 20 ppm spray. 3-4 applications of PGRs are needed to produce in quart or gallon containers.

Annual , 4"/4.5"/Quart/10 cm , 1 (ppp), 9-10 (weeks), Spring PGR paclobutrazol 15-20 ppm Spray Annual , 5"/6"/1 Gallon/15 cm , 1-3 (ppp), 9-10 (weeks), Spring PGR paclobutrazol 15-20 ppm Spray Annual , 5"/6"/1 Gallon/15 cm , 3 (ppp), 8-9 (weeks), Autumn PGR paclobutrazol 15-20 ppm Spray Annual , 10" Pot or HB/3 Gallon/25 cm , 4 (ppp), 8-9 (weeks), Autumn PGR paclobutrazol 15-20 ppm Spray

No

89

+1 630 231-1400 • panamseed.com / FINISHING GUIDE

Powered by